Home / Services / NFP & Leasing
Leading NFP Provider Malaysia

Network Facility Provider (NFP) & Tower Leasing

Prima Cell owns and leases telecommunication infrastructure to operators across Malaysia. Share our sites and get on air faster, at lower cost.

NFPMCMC Individual Licence
30+Structures owned
2030Licence valid until
RAOPublished access terms
MCMC licensed provider

What a licensed NFP does

A Network Facility Provider (NFP) is licensed by the Malaysian Communications and Multimedia Commission (MCMC) to own and provide network facilities such as towers, poles, ducts and fibre. Operators then install their equipment on those facilities.

Prima Cell holds NFP Individual Licence NFP/I/2000/456, valid until 27 December 2030. It allows us to own and provide network facilities anywhere in Malaysia.

Site leasing for telcos

Shared by Malaysia's operators

SiteStateOperatorsStructure
Forest CityJohorMaxis, Digi, U Mobile, Celcom30m lamp pole
Layang-LayangJohorMaxis, Digi30m lamp pole
Mutiara RiniJohorMaxis, Digi30m lamp pole
Kg Bukit KenakTerengganuCelcomDigi45m slim tower
Wakaf Nyior, Kembang MarangTerengganuCelcomDigi45m slim tower
UniSZATerengganuU Mobile30m lamp pole

Selected sites from the Prima Cell structure list.

Reference Access Order (RAO) & common access

Fair, transparent access for every operator

As a licensed NFP, Prima Cell publishes a Reference Access Order (RAO). It sets out the terms on which any licensed access seeker can request space on our facilities, in line with MCMC's access framework.

Common access means one structure serves many operators. Fewer towers are built, costs fall for everyone, and communities get better coverage with less visual impact.

FAQ

Common questions

Is Prima Cell a licensed Network Facility Provider?

Yes. Prima Cell holds MCMC NFP Individual Licence NFP/I/2000/456, valid until 27 December 2030.

Which operators lease Prima Cell sites?

Our sites are used by Maxis, CelcomDigi, Digi, Celcom and U Mobile.

How can an operator request access?

Any licensed access seeker can apply under our Reference Access Order, which sets fair, non-discriminatory terms.

Can Prima Cell build a new site to lease?

Yes. We acquire, design and build new sites where operators need coverage, then lease them long term.

Need coverage in a specific area?

Send us the location and we will check our nearest sites or plan a new one.

Chat with us